Installation
Heavy Load And Fire Lane Access
There are two primary methods of grass treatment for
"Fire Lane and Heavy Vehicular" access roads. The first method of
planting is illustrated in the detail below. The sod or finished grass surface is above the paving grid work.
The "second" method utilizes a seeded surface where there
is a likelihood of more frequent vehicular traffic. Fire lanes are generally designated for emergency traffic only and
therefore do not need the exposed (paver) surface found in the
second method. The "Light to Moderate Weight"
application can be used for pedestrian, golf cart and similar
applications. If soils are questionable you can always use the
"Heavy Load" grass treatment. Note that "sprinkler
heads" can be placed through the bottom of the Tuffrack
Grassroad Pavers if conditions warrant their use.

|